First of all, according to the site situation, determine the scope of lighting, and then determine the reasonable installation position; Secondly, according to the fixed point, determine the length and width of the foundation pit, and then mechanical or human excavation; The third is to tie the steel cage. The reinforcement and embedded parts are bound firmly with iron wire according to the construction drawing, and put into the foundation pit, the reinforcement cage should ensure that it is perpendicular to the horizontal plane; The fourth is the foundation casting. Pour the mixed concrete into the foundation pit. Fifth, fill in the foundation. When the poured concrete is dry, fill it with earth and tamp it down.

Then before the tuya led panel company lifts, it must be done: the lifting rope is on the main parts of the rod body, and it must not be connected to the climbing nail or the fixing bar of the rod top plate. Must be above the center of gravity of the rod body (including the weight of the equipment).

Secure the light tray and cable and wire rope before hoisting to ensure that the light tray will not slide when the light pole is lifted. The lifting of the light pole requires a shackle to connect a wire rope from the flange reinforcing plate to the lifting lanyard and fix it well to prevent the lanyard from slipping.

When the rod body is placed on the horizontal adjusting nut, the nut on the foundation should be installed as soon as possible. At the same time, adjust the horizontal adjusting nut so that the center line from the top of the rod to the bottom of the rod is perpendicular to the ground. Generally, two 90-degree directions are used to measure.

Lift the lamp plate to a certain position with the crane, insert the lamp plate into the joist of the rod body, put the lamp plate down, put on the steel wire from the installation hole of the wire rope respectively, pass through the wedge and then put it back up with the steel wire tie to fix, and adjust the levelness of the lamp plate.

The light source of tuya led panel company uses LED lights, and the number of LED lights is mainly between 3-20. The number of lamps depends on the lighting area. Generally, on a six-pole 11-a-side football pitch, there will be slightly more tuya led panel companies in the middle of the pitch than there will be light poles left and right. For example, in the football stadium lighting project of Guangzhou No. 1 High School, 12 tuya led panel companies were installed on the middle pole, while 6 tuya led panel companies were installed on the two sides of the pole.

tuya led panel company https://www.xjledlighting.com/product/Wifi_tuya_led_ceiling_panel_light.html